Open Forum - Greater Manchester Spatial Framework

Meeting: 15/12/2016 - Bramhall & Cheadle Hulme South Area Committee (Item 4)

4 Open Forum - Greater Manchester Spatial Framework pdf icon PDF 66 KB

Local residents are being invited to attend their local Area Committees and to learn more about the Greater Manchester Spatial Framework (GMSF) proposals.

 

The GMSF plan seeks to build 19,000 homes in the next two decades across Stockport, as well as bring new jobs and new infrastructure (such as transport links, utility networks, schools and health provision) required to achieve this.

Minutes:

The Corporate Director for Place Management and Regeneration attended the meeting and made a presentation in respect of the consultation being undertaken by the Greater Manchester Combined Authority on the Greater Manchester Spatial Framework.

 

The following comments were made/ issues raised:-

 

·         The adoption of the final Greater Manchester Spatial Framework document would require the agreement of each of the ten Greater Manchester districts.

·         Concern was expressed that the consultation process had not been well publicised and that the consultation period should be extended.

·         It was commented that the large development sites proposed were concentrated in the south of the Borough

·         The next phase of the consultation would include additional details around the potential nature of development on each of the proposed sites.

·         The viability of the proposed sites was predicated on a significant investment in infrastructure improvements.

·         It was commented that the proposed development site in Woodford was subject to flooding which would be difficult to ameliorate.

·         The population projections which had formed part of the evidence base for the GMSF were developed from DCLG household projections.  It was commented that this was subject to a significant margin of error.

·         It was suggested that there should be an intensification of development within the town centre where there was already the infrastructure to support it to offset some of the proposed development sites elsewhere.

·         There needed to be a greater focus on the use of brownfield sites.

·         It was suggested that Stockport should aim to develop its own local plan as a substitute for the GMSF process which would result in a large proportion of the green belt being given over to housing.

 

RESOLVED – That the Corporate Director for Place Management & Regeneration be thanked for her attendance and presentation and that the public be thanked for the positive way in which they had contributed to the discussion on this item.


Meeting: 13/12/2016 - Stepping Hill Area Committee (Item 4)

4 Open Forum - Greater Manchester Spatial Framework pdf icon PDF 66 KB

Local residents are being invited to attend their local Area Committees and to learn more about the Greater Manchester Spatial Framework (GMSF) proposals.

 

The GMSF plan seeks to build 19,000 homes in the next two decades across Stockport, as well as bring new jobs and new infrastructure (such as transport links, utility networks, schools and health provision) required to achieve this.

Minutes:

Mr Richard Wood, Stockport Council’s Technical Policy and Planning Manager, attended the meeting and made a presentation in respect of the consultation being undertaken by the Greater Manchester Combined Authority on the Greater Manchester Spatial Framework.

 

The Greater Manchester Spatial Framework was a joint development plan document which was being prepared by the ten local authorities in Greater Manchester. It would be a strategic plan which ensured that Greater Manchester protected and enhanced the current infrastructure and had the right land in the right places to deliver the homes and jobs needed up to 2035, along with identifying the new infrastructure required to achieve this. It aimed to ensure that Greater Manchester became as well known for the quality of its environment as for its economic success.

 

If adopted the plan would be the overarching development plan within which Greater Manchester’s ten local planning authorities could identify more detailed sites for jobs and homes in their own area. As such the Greater Manchester Spatial Framework would not cover everything that a Local Plan would cover and individual districts would continue to produce their own Local Plans.

 

The following comments were made/issues raised:-

 

·         Concerns were expressed that the proposed sites in the High Lane and Hazel Grove areas would not contribute significantly to the solution of the housing shortage as they would be larger, expensive properties.

·         Concerns were expressed that the plan gave primacy to housing development over infrastructure, although this was the more pertinent issue for existing communities.

·         The SEMMMS Strategy was designed to solve existing problems with transport infrastructure, without the additional pressures these proposals would create. Given the likely demands on resources for infrastructure investment across Greater Manchester arising from this Plan, there was a danger that any development would not be supported with the promised infrastructure investment.

·         Why was higher density of town centre development not being considered?

·         Investing funds to support brownfield reclamation would offset the cost of new infrastructure on greenbelt.

·         Concerns were expressed by members of the public that the consultation website was not easy to use and may discourage engagement. In response, it was acknowledged that this facility was not ideal, but that improvements were difficult to achieve while the consultation was active. Feedback would be considered as part of the next phase of consultation.

·         Had any consideration been given to whether the level of development was desirable?

·         Concerns were expressed about the unprecedented scale of building that may be taking place.

·         Would the refreshed SEMMMS Strategy given consideration to the potential impact of the GMSF?

·         What safeguards were there to prevent developers ‘cherry picking’ sites?

·         A public question asked earlier in the meeting referenced the need for greenbelt to act as a ‘buffer; between communities or built areas. Given the proposals in the Plan, it would seem to contradict this earlier response. In response, the seeming contradiction was acknowledged, and it was stated that this ‘buffer’ might not be achievable in all cases. It was also stated that the value of the greenbelt land itself needed to be considered.

·         Clarification was sought on the process for adopting the Plan. In response it was stated that unanimous agreement of all ten local authorities in Greater Manchester, and the future Greater Manchester Mayor and their cabinet was needed.

·         How were the infrastructure improvements to be funded?

 

In response to issues raised, it was stated that in order to release greenbelt, partners would need to be have exhausted other sites, including brownfield sites, in order to demonstrate special circumstances for the release of greenbelt. There had to be a reasonable certainty that the plan was deliverable in order for it to accepted by the Planning Inspectorate, and part of this would include ensuring brownfield development first and that the infrastructure improvements were achievable, and this would include work associated with SEMMMS. The Council was continuing to engage in work to identify sites and increase the  ...  view the full minutes text for item 4


Meeting: 12/12/2016 - Werneth Area Committee (Item 4)

4 Open Forum - Greater Manchester Spatial Framework pdf icon PDF 66 KB

Local residents are being invited to attend their local Area Committees and to learn more about the Greater Manchester Spatial Framework (GMSF) proposals.

 

The GMSF plan seeks to build 19,000 homes in the next two decades across Stockport, as well as bring new jobs and new infrastructure (such as transport links, utility networks, schools and health provision) required to achieve this.

Minutes:

Representatives of the Corporate Director for Place Management and Regeneration attended the meeting and made a presentation in respect of the consultation being undertaken by the Greater Manchester Combined Authority on the Greater Manchester Spatial Framework.

 

The following comments were made/ issues raised:-

 

·         Concern was expressed that a large number of the sites that would affect the Werneth area were located in the Tameside area and which did not form a significant part of the ongoing consultation taking place within the Stockport area.

·         It was commented that the consultation had not been well publicised.

·         It was asserted that the current Bredbury Park Industrial Estate was not used to capacity and the proposal to significantly extend the Estate was therefore unnecessary.

·         Not all of the affected landowners had been directly informed of the proposals.

·         The consultation period was insufficient to allow full engagement with the public and to enable them to formulate a considered response.

·         Each site will be the subject of a masterplan which would provide additional detail on the potential for development.

·         It would be difficult to increase the capacity of existing transportation infrastructure to facilitate a number of the proposed sites.

 

RESOLVED – That the report and presentation be noted.